We are currently working on a 63 bed care home in Wrexham where we are doing the groundworks.

This is  a garage in Churton that we converted into an office. Cheshire common bricks were used and patio doors, entrance door and window installed.

Tagged under:

Pond construction in Ruthin.

Tuesday, 03 November 2015 by

We constructed a pond, put in place underground drainage. The area was finished in clean limestone and a treated timber fence erected.

The wall was built in Berwyn slate, steel posts were erected which the double entrance gate sits on.

Preparation for lay down of pattern imprinted concrete at Chapel Garden, Chester University. The Garden is being redeveloped by us to commemorate 175 years of Chester University. Attached is a photo at the start of the job and more photos showing the end product.

We built a new conservatory at Harwoods Lane Rossett. Brickwork, blockwork, steelwork, plaster boarding, patio doors and windows installation.

M&T Groundworks recently done some joinery work and floors at Vicars Cross, United Reformed Church, Chester. M&T cut back the floor, which was then raised with screed, levelled then finished off, to allow for disabled access. Also the altar was knocked down, a bespoke handrail was made and some electrical work was also carried out.