Pond construction in Ruthin.

Tuesday, 03 November 2015 by

We constructed a pond, put in place underground drainage. The area was finished in clean limestone and a treated timber fence erected.

The wall was built in Berwyn slate, steel posts were erected which the double entrance gate sits on.

Area was excavated, we then erected treated timber fence and then layed down clean limestone and edging stones.

We constructed a new access road through The University of Chester, Parkgate Road campus. We installed retaining walls, built walls both brick and block work, introduced  new surface water drainage system along with pavement works, kerbing, street lighting and erected road signs.

Preparation for lay down of pattern imprinted concrete at Chapel Garden, Chester University. The Garden is being redeveloped by us to commemorate 175 years of Chester University. Attached is a photo at the start of the job and more photos showing the end product.